DOJO MALICK AMEDAH​
Location: Bobigny (FR)
Program: Reconstruction of the Delaune dojo
Client: Ville de Bobigny
Calendar: Delivery scheduled for January 2024
Team: MATHIS entreprise mandataire + archi5 + berim + agi2d + tempeol +casso + CALMM (sous-traitant MATHIS et archi5)
Images: 11h45
The new Dojo presents a strong and emblematic image. We aim to create a building that embodies its purpose, expressing the values of sport, excellence, and humility. Our proposal is an elegant and timeless structure designed to provide a lasting space for both practice and daily life while exemplifying an environmentally responsible approach.
The building consists of a simple, almost cubic volume, topped with an elevated section that accommodates the multipurpose hall and integrates the technical facilities. The treatment of all façades is uniform, with the same careful attention given to each. The roof is green, featuring a substantial layer to support lush vegetation and achieve the required biotope coefficient.
The entrance hall is revealed through a large corner glass façade, offering a glimpse of the warm and welcoming natural wood interior. Spacious openings provide the practice rooms with generous and controlled natural lighting.
Both understated and sophisticated, the façade evokes the suppleness of fabric, structured within a grid that varies by level, where concave curves appear at two different scales.
TIMBER CONSTRUCTION // OFF-SITE CONSTRUCTION //RE2020