CALMM is a Paris based group practicing architecture, urbanism and design. CALMM was founded in 2015 by Fabio Cavaterra (architect), Luis Masiá Massoni (architect) and Fabien Terreaux (photographer) following their EUROPAN 12 winning proposal of an ecological urban project in Seraing, Belgium.

The cultural diversity and multidisciplinarity of its founding members gives CALMM a european character, rich in exchanges and a capacity to project itself in a local as well as an international context.

The projects demonstrate a willingness to integrate into the environment, based on an exhaustive analysis of the place and with the aim of creating a positive positive and satisfactory harmony between the different parts of the city.

 

 

ARCHDAILY
 
The world's most visited architecture website published the winning proposal of the urban project SYNERGIE by CALMM

 

PUBLICATIONS

LE MONITEUR N° 5912
Médiathèque communautaire à Sainte-Geneviève-des-Bois 
 

 

RESULTS OF EUROPAN 12&13 IN AUSTRIA / THE ADAPTABLE CITY
 
The publication presents 40 international projects from two competition rounds for nine locations in six Austrian towns and cities: Amstetten, Bruck/Mur, Graz, Linz, St. Pölten and Vienna
 

 

The Adaptable City 2
 
For the thirteenth edition of the competition EUROPAN publishes the catalogue of the winning projects on 49 European sites from the 15 participating countries.

 

LA CIUDAD ADAPTABLE 2
 
El catálogo de los resultados de EUROPAN 13 España recoge los 15 proyectos premiados por el jurado de nuestro país y los 36 proyectos de equipos españoles que han obtenido reconocimiento en 23 ciudades de otros países participantes en EUROPAN 13: Alemania, Austria, Croacia, Finlandia, Francia, Italia, Kosovo, Noruega, Países Bajos, Polonia, Portugal y Suiza.
 

 

AV Proyectos
 
Europan 12, Spanish Winners
 
 
 
 
ARCHITEKTUR / WETTBEWERBE
 
Austrian-based magazine ARCHITEKTUR / WETTBEWERBE has published austrian winning proposals of EUROPAN 13. The magazines includes the project OSMOSE by CALMM, Special Mention of EUROPAN 13.

 

EUROPAN 12 FRANCE CATALOGUE DES RÉSULTATS
Le catalogue français des résultats présente les 22 projets sélectionnés ainsi que les 7 sites partenaires de la 12e session d’Europan France.  Les projets français sélectionnés sur les sites européens y sont également 
 
 
 
 
The Adaptable City
 
For the twelfth edition of the competition EUROPAN publishes the catalogue of the winning projects on 51 European sites from the 16 participating countries.
This book constitues a unique panorama of young European talented designers working between the urban and architectural scales.

 

ADAPTAR LA CIUDAD Y LA ARQUITECTURA A LOS RITMOS URBANOS
 
La publicación de los resultados de EUROPAN 12 España recoge los 14 proyectos que ha premiado el jurado de EUROPAN/España y los 35 proyectos de equipos españoles que han obtenido reconocimiento en 19 ciudades de otros países participantes en EUROPAN 12.

 

TEAM

Fabio Cavaterra, founder

Luis Masiá Massoni, founder

Luisa Barbudo Morales, architect

Joan Sanz Dopateo, architect

Laurie Roturier, Business Development
 

If you want to work with us cavaterramasia@calmm.eu

CV

2020- 53 social dwellings/ Location: Montreuil  / Budget: 6.821.000 € HT / Client: OPH Montreuillois / Team: CALMM architecture  + archi 5 + MIZRAHI + ETAMINE + AIDA / Timetable: Competition february 2020 - WINNER - ongoing

 

2019- 43 social dwellings/ Location: Sainte-Geneviève-des-Bois  / Budget: 4 160 000 € HT / Client : Sorgem / Team: CALMM architecture  + archi 5 + FACEA + OASIIS / Timetable: Competition 2019

 

2019- Duplex / Location: Paris XIX / Budget: 80 000 € HT / Maîtrise d’ouvrage : private / Architect: CALMM architecture / Timetable:  juin 2020

 

2019- Penthouse/ Location: Paris XXV / Budget: 200 000 € HT / Maîtrise d’ouvrage : privé / Client: CALMM architecture / Timetable: completion june 2020

 

2019- EUROPAN 15 / Location: Romainville, France / Timetable : concours july 2019

2018- Private house rehabilitation / Location: Eliana (Spaine) / Budget : 125.000 € TTC / Client : private / Architects: CALMM architecture / Timetable: Completion 2019

2017- Gymnasium/ Location: Paris XVIII / Budget: 8.200.000 € HT / Client : Mairie de Paris / Team: Archi5 + cotec + coloco + CALMM architecture / Timetable: Completion june 2020

2017-  82 social dwellings logements, activities and gardens / Budget: 12 038 000 € HT / Client : RATP Habitat & Terralia / Team: Archi5 + EPDC + endroits en vert + CALMM architecture / Timetable: Panned completion oct. 2020

 

2017- Private house extension and transformation/ Location:Villejuif / Budget: 120 000 € HT / Client : Private/ Architect: CALMM architecture / Timetable: 2017

 

2017- EUROPAN 14 / Location: Alcoy, Espagne / Timetable: concours juillet 2015

2018- Private house rehabilitation / Location: Eliana (Spaine) / Budget : 100.000 € TTC / Client : private / Architects: CALMM architecture / Timetable: Completion 2019

2017- Restructuration of the Centre Hélio Marin / Location: Berk-sur-mer (62) / Budget: 5.000.000 € HT / Client : Fondation Hopale / Architect: CALMM architecture + DVVD/ Timetable: competition sept 2017
 

2016- Media Library /  Location: Sainte-Geneviève-des-bois (91) / Budget: 7.860.000 € HT / Client: Coeur Essonne Agglomération - SORGEM / Architect: CALMM architecture + archi 5 prod/ Timetable: competition 2016 - WINNER - Planned completion sept. 2020

 

2016- High school / Location: Genzano (IT) / Budget: 2.800.000 € HT / Client : City of Genzano/ Architect: CALMM architecture / Timetable:  competition août 2016

2016- Rehabilitation of the école de commerce. Offices, housing and nursery school/ Budget : NC M € / Client : NACARAT - FINAPAR / Architect: DVVD - BECHU  / Collaborators : CALMM architecture / Timetable: competition 2016 - WINNER - Planned completion: -

2016- Stadium / Location: Nogent sur Marne / Budget:  6 504 000 € HT / Client : Marne-au-Bois-Aménagement - Ville de Nogent-sur-Marne / Team : SYLVAMETAL - archi5 /  Collaborators : CALMM architecture / Tiemetable : competition 2016

2016- 31 social dwellings and medical center, secteur Binet, porte de Montmartre / Budget : 3 385 000 € HT / Location:  Paris, France. / Surface : 2500 m²  / Timetable: Competition January 2016 - Completion 2020 / Client : Foncière logements, créateur de mixité sociale / Architects: archi5prod / Collaborators: CALMM

2016-  Pleyel bridge + office and cultural building / Location: Paris, France. / Timetable : Competition April 2016 / Client : Communauté d’Agglomération Plaine Commune. Grand Paris  / Architects: DVVD / Collaborators: CALMM

2016- Private house extension and transformation in 5 phases / Location: Valencia, Espagne. /  Timetable : completion 2017 / Client : Private / Architects: CALMM + Joan Sanz

2016-Rehabilitation and extension of a nursery school / Location: Renens, Switzerland. / Timetable : Competition January 2016 / Client : City of Renens / Architects: CALMM + Joan Sanz

2016- Rehabilitation of the Espace Beaudelaire cultural center / Location: Lyon, France. / Timetable : Competition March 2016 / Client : Ville de Rillieux-la-Pape / Architects: DVVD / Collaborators: CALMM

2015- Facade renovation feasibility for an office building / Location: Lyon, France. / Timetable : Feasbility october 2015 / Client : AMUNDI / Architects: DVVD / Collaborators: CALMM

2015- Facade renovation feasibility for a housing building / Location: Lyon, France. /  Timetable : Feasbility november 2015 / Client : Private / Architects: DVVD / Collaborators: CALMM

2015- Feasbility for a dwelling and commercial building / Location: Clamart, France. /  Timetable : september 2015 / Client : Private / Architects: CALMM

2015- EUROPAN 13 Urban plan + Mixed Use / Location: Sankt Pölten, Austria. / Timetable : Competition prize SPECIAL MENTION december 2015. Competition: June 2015 / Client : City of Sankt Pölten / Architects: CALMM

2015- Tramway center for maintenance and storage for T10 Paris Line / Location: Clamart, France. / Timetable : Competition July 2015 / Client : transamo, STIF / Architects: archi5prod / Collaborators: CALMM

2015- Private house / Location: Boulogne-Billancourt, France / Timetable : Ongoing / CLIENT : Private / Architects: CALMM

2015- High School and kitchen 2500 meals, housing for teachers end and a swimming pool / Location: Clichy-sous-bois, France. /  Timetable : Competition prize winner january 2012 - Completion in september 2015 / Client / Architects: Efficol 1 - Seine-Saint-Denis / : archi5prod architects / Collaborators: CALMM

2015- Rebuilding of the appretnice school of building profesion. Workshops, classrooms, sports hall, restaurant, landscaping. Environmental specification : Consumption < 5% Max consumption normLocationBrétigny sur Orge, France. / Timetable : Competition prize winner March 2013 - Completion Sept. 2016 / Client : BTP-CFA Île de France. Sorgem AMOArchitects / : archi5prod / Collaborators: CALMM

2013- EUROPAN 12 Urban plan + Mixed Use / Location: Seraing, Belgium / Timetable: Competition prize WINNER december 2013. Competition: June 2013 / Client : SPI, Arcelor Mittal / Architects: CALMM

2013- Private flat rehabilitation / Location: Paris, France /  Timetable : completion 2014 / Client : Private / Architects: CALMM

2012- Culture, housing and office building / Location: Nyon, Switzerland. / Timetable : Competition december 2012 / Client : City of Nyon

2012 - Private house / Location: Nemi, Italy / Timetable: Completed / Client : Private / Architects: CALMM

2012- Migrant hostel/ Location: Lechería, Mexico. / Timetable : Competition prize FINALIST march 2012 / Client :Arquine competition / Architects: CALMM + Jose Antonio Juan + Rubén Salvador Torres

2011- EUROPAN 11 Urban plan + Mixed Use / Location: Marche en famenne, Belgium /Timetable : Competition: June 2011 / Client : City of Marche en Famenne / Architects: CALMM + Jose Antonio Juan + Elvira Nebot + Patricia Salvador + Carlos Torres